AI Agent Testing — Status 2026-07-23
Delivery / Program Management — periodic status report. Source:
sprint-drift-auditpass 9 (reconciliation).
Summary
sprint-drift-audit pass 9 carries F-14 (code-evidence-gap) to its 7th open pass. Progress
stays 0% by rule — this entry restates the descope decision owed, not a new estimate. Board shows
9 of 15 sprint issues done, 5 code-corroborated, but none joins a breakdown task id for a man-day
credit (BOT-4654 ≈ Task 2.1 remains the flagged candidate, pending DRI join — F-13).
Risk & dependency changes
- F-14
code-evidence-gap— ⛔ escalated, 7th pass. BOT-3949, BOT-4616, BOT-4617, BOT-4618 are Won't Fix with no merged-code trace onchatbotorigin/master(re-grepped after fetch 2026-07-23). Decision owed (assignee/DRI + Dimas Fauzi Hidayat): confirm these are descoped and shrinkeffort_total_days(currently 37.5) accordingly, or fix the board status. Until that lands,progress_pctcorrectly stays 0% and the forecast overflow (p50 2026-10-04) stands. - Staffing: Eko Aprianto added to
implementorsthis pass (F-33) — owns BOT-3942 (In Progress, the 107-day-old carryover) under BOT-3351.
Metrics
- Progress: 0 / 37.5 man-days (0%) — unchanged; no board issue joins a breakdown task for credit.
- Forecast: p50 2026-10-04 · p85 2026-10-25 (basis: judgment) — unchanged.
Next period
- Land the F-14 descope call and re-baseline
effort_total_days. - Confirm the BOT-4654 ≈ Task 2.1 join (2.5 md candidate) so a future pass can credit progress.